Tank installed
   
Leveling the tank was a bit nerve-wracking since the tank would form the foundation for the whole structure. The top of the tank sits with about 4 inches exposed above grade level so the structure looks like it sits on a concrete foundation.



<< First | < Previous 1 | 2 | 3 | 4 | 5 | 6 | 7 Next > | Last >>
©2003 Paul and Harlene